【工业管理】最短路径法

Professional Halloween 'Haunters' Channel Method Acting To Deliver Real Scares play pause stop mute unmute max volume 00:0003:25repeat repeat off Update Required To play the media you will need to either update your browser to a recent version or upd

发表于:2018-12-02 / 阅读(353) / 评论(0) 分类 2016年NPR美国国家公共电台10月

[00:00.00]detail n. vt. [00:00.73]细节 详述 [00:01.46]avenue n. [00:02.14]大街 [00:02.82]personal a. [00:03.59]个人的 [00:04.36]independent a. [00:05.09]独立的 [00:05.83]somewhere adv. [00:06.52]在某处 [00:07.21]abroad adv. [00:08.01]在

发表于:2018-12-05 / 阅读(366) / 评论(0) 分类 工商管理英语

A-B-C METHOD OF MANAGING ATTITUDES As an airport skycap checked through a customer at curbside, he accidentally knocked over the man's luggage. He quickly collected the fallen bags and apologized for the mishap. Unappeased, the traveler burst into a

发表于:2018-12-07 / 阅读(468) / 评论(0) 分类 每天一点英文

THIS IS AMERICA - Theater for the Blind; Suzuki Method; Gluten-Free Foods JUNE SIMMS: Welcome to THIS IS AMERICA in VOA Special English. I'm June Simms. CHRISTOPHER CRUISE: And I'm Christopher Cruise. This week on our program, we visit a theater that

发表于:2018-12-16 / 阅读(272) / 评论(0) 分类 2012年VOA慢速英语(八)月

我上个月坐火车到纽约去看朋友,上车后刚要坐下,旁边座位上的女乘客就开始很大声的自言自语,看上去精神好像不太正常,吓得我只好在过道对面远远地坐下。 后来我注意到,每次有人要

发表于:2018-12-16 / 阅读(351) / 评论(0) 分类 美国习惯用语

Books and Arts;New film 文艺;新片上映 Method in the madness 疯狂中的理智 A searching look at what caused the split between Freud and Jung 深度挖掘:弗洛伊德、荣格决裂的原因 Psychoanalysis, as practised by Carl Jung and

发表于:2018-12-31 / 阅读(381) / 评论(0) 分类 经济学人文艺系列

Children Learn to Play Music by Listening in Suzuki Method Five-year-old Hannah Mei Steury started violin lessons two months ago. Her teacher, Stephanie Flack, says Twinkle, Twinkle Little Star is the first song children learn to play. Its a very sim

发表于:2019-01-13 / 阅读(295) / 评论(0) 分类 VOA标准英语2012年(七月)

A Step Closer to Major HIV Prevention Method A U.S. government panel has recommended the use of a once daily pill to help prevent HIV infection. The pill has been shown to be very effective in studies. The Food and Drug Administration, the FDA, now h

发表于:2019-01-13 / 阅读(300) / 评论(0) 分类 VOA标准英语2012年(五月)

SAF New Fire-Building Method Reduces Air Pollution With their megaphones and orange uniforms, these fieldworkers do not go unnoticed. This is Fine Town, a township south of Johannesburg. Every day, the fieldworkers walk around the townships to show t

发表于:2019-01-13 / 阅读(348) / 评论(0) 分类 VOA标准英语2012年(三月)

Shall we take a vote? 我们是否要投票决定? Shall we take a vote? 我们是否要投票决定? It seems to be the best method. 这似乎是最好的办法了。 It's time we get back to business. 我们该回到正题上了。 It's time we

发表于:2019-01-18 / 阅读(277) / 评论(0) 分类 玩转商务英语900句

VOICE ONE: I'm Steve Ember. VOICE TWO: ''Revolt on the Amistad,'' silkscreen print by Jacob Lawrence And I'm Barbara Klein with EXPLORATIONS in VOA Special English. At the National Gallery of Art in W

发表于:2019-01-30 / 阅读(354) / 评论(0) 分类 2006年慢速英语(十二)月

拓扑排序 topological sort 偏序 partical order 拓扑有序 topological order AOV网 activity on vertex network AOE网 activity on edge network 关键路径 critical path 匹配 matching 最大匹配

发表于:2019-02-01 / 阅读(223) / 评论(0) 分类 实用英语

The more Japan's global relevance in economic, political and military terms seems to decline, the more it cares about projecting soft power. The government's Cool Japan project subsidizes attractive products or services that, according to the Ministr

发表于:2019-02-02 / 阅读(311) / 评论(0) 分类 趣味英语

Traditional Teaching Method Do your teachers still use traditional techniques to teach you nowadays? A revol- ution in teaching techniques is required now. In the past, we just took it for granted that a teacher' s aim was to teach the students all t

发表于:2019-02-08 / 阅读(290) / 评论(0) 分类 英语作文

1). We study spoken English so as to make oral communications, so this order of importance of oral English study should be followed: Fluency, Accuracy, and Appropriateness. That is to say, we have to pay more attention to practical communicating abil

发表于:2019-02-18 / 阅读(275) / 评论(0) 分类 英语学习方法

提高英语口语的方法 (1). We study spoken English so as to make oral communications, so this order of importance of oral English study should be followed: Fluency, Accuracy, and Appropriateness. That is to say, we have to pay more attention to

发表于:2019-02-19 / 阅读(262) / 评论(0) 分类 英语学习方法

高效的英语口语学习方法 口语学习方法总汇,但方法毕竟只是方法,它最终无法取代刻苦的学习,一起来看看总结出来的口语学习方法都有哪些吧。 (1)。We study spoken English so as to make oral comm

发表于:2019-02-19 / 阅读(333) / 评论(0) 分类 英语学习方法

英语口语的学习方法 方法就是方法,它最终无法取代刻苦的学习。 Oral English:(口语学习方法总汇) (1)。We study spoken English so as to make oral communications, so this order of importance of oral English

发表于:2019-02-19 / 阅读(292) / 评论(0) 分类 英语学习方法

讲解文本: work 运转,奏效 My TV remote doesn't work. 我的电视遥控器坏了。 Mike used a new method. It worked. 麦克用了新方法,而且奏效了! 疯狂练习吧!

发表于:2019-02-23 / 阅读(234) / 评论(0) 分类 愉悦口语

(1).We study spoken English so as to make oral communications, so this order of importance of oral English study should be followed: Fluency, Accuracy, and Appropriateness. That is to say, we have to pay more attention to practical communicating abil

发表于:2019-03-02 / 阅读(286) / 评论(0) 分类 英语口语
学英语单词
a slice of ham
acryloyl
adjustment problems of adoptive children
Aeonium
Arbeost
arrears of wages
artow
Backseat Browser
battle-clad
be bound up with
bisphosphine
catchphrases
catheter-related
class density function
clerical work
cloud-seeding agent
cochineal figs
coming into force
computational element
cooeyed
cooperative shop
dab hands
Deptford Pink
diphenylmethylpiperazine
double-seated ball valve
electrial resistance welding tube
endearing to
eupatrid
Eustrongylus visceralis
fibre composite
final and binding
Fremantle Doctor
fusspot
genus Smyrnium
geocentric right ascension
governed word
Hemipilia cordifolia
Homocodon
Humboldt County
infrared beam splitter
infrasonic wave
insulation classification
introes
Kalantonin
kimmy
life-boat
line reactance
lla
long rear-pivoting boom
longitudinal current
low-foaming detergent
lubricator shank
Lumbayao
lupus erythmatosus
m-xxl
mesencephalic nucleus of trigeminal nerve
metallurgical contacting system
modular multiplication
nevus lipomatosus cutaneous superficialis
nueleoside phosphorylase
once-through cooling
operating current
parnells
peanut worms
peonages
periodontal therapeutics
pile poisoning
position-setting
pregnadienediol
preponderence
press-fit package
promisest
protoporphirin
pyramis ossis temporalis
relaxed synthesis
rhizoma graminis
rie-grass
salia effervescentia
scalar field
scale infrared thodolite
scraggles
sedentary benthos
shelled corn drier
shmuks
single-lane channel
speak ... language
spinto
stavings
strawberry capillary hemangioma
Sulpiril
t-series
Tagânt, Rég.du
teleost muscle trajectories
temperature-dependent resistor
to loot
trister
turn-allocations
u-bolt
umbrosity
void structure
vovak
worm thrust bearing