临界路径

(一)字数误区 很多人真的把字数看得很重, 无论ETS怎么说, 都没用。 普林斯顿大学曾经对ETS-GRE 6分作文做过分析,发现不论你用怎样的标准去衡量那些文章,你会发现只有一个FACTOR是相同

发表于:2018-11-29 / 阅读(209) / 评论(0) 分类 GRE英语

Our eyes are two of the most important things in our lives. We use them every second we are awake. They help keep us safe, recognize friends, and select things we like. It is possible to lead happy and healthy lives without being able to see, but it

发表于:2018-11-30 / 阅读(219) / 评论(0) 分类 常春藤生活英语

Goodbye Beautiful Day--BeatPath (MV) L.A.'s ground-breaking new rock band, Beat Path, was formed in 2001 by the dynamic songwriting team of Douglas Ladnier (vocals) and Barrett Yeretsian (drums). Now with Alex Ruiz (guitars), Clint Feddersen (bass),

发表于:2018-12-07 / 阅读(208) / 评论(0) 分类 娱乐新天地MV 2006

Situation Critical 十万火急 by Kevin Lustig In some jobs, danger can appear at any moment. In the blink of an eye, the routine can become perilous. This month, the National Geographic Channel shows us what happens when a normal situation becomes

发表于:2018-12-08 / 阅读(189) / 评论(0) 分类 常春藤解析英语

The UN has just issued a report saying that six million people in Myanmar need food right now. How critical is the situation? It's a real paradox, because in the same year that Cyclone Nargis devastated the, what had been the rice bowl of Myanmar, th

发表于:2018-12-11 / 阅读(185) / 评论(0) 分类 访谈录2009

发表于:2018-12-13 / 阅读(169) / 评论(0) 分类 Wee Sing Around the World

In Houston, Flight director Kranz is trying to make sense of the barrage of information. I am completely surrounded with reports coming in that I dont fully understand, but frankly, problems are our business, and I thought we are going to solve these

发表于:2018-12-30 / 阅读(230) / 评论(0) 分类 国家地理2007年

Primrose是一种淡黄色的可爱花朵,名叫樱草花。它的花呈管状,聚集在一起形成伞形花序,花冠呈漏斗形或托盘状。Primrose起源于中古拉丁文prima rosa,意思

发表于:2019-01-07 / 阅读(155) / 评论(0) 分类 英文语法词汇

高考英语阅读理解得分秘籍 在英语考试中,阅读理解往往是决定成败的关键,巧解阅读理解中关于作者意图、观点、态度的问题是在阅读理解中取胜的关键法宝。 作者观点态度题就是指针对作

发表于:2019-01-08 / 阅读(239) / 评论(0) 分类 英语学习方法

By Greg Flakus Houston 05 March 2008 Hillary Clinton made a stunning comeback in Tuesday's primaries and caucuses, winning decisively in Ohio and Rhode Island and coming out on top of a close race in Texas. John McCain won all four states, to clinch

发表于:2019-01-08 / 阅读(168) / 评论(0) 分类 VOA标准英语2008年(三月)

By Melinda Smith Washington 06 September 2007 In 2006, the World Health Organization issued a report that a critical shortage of doctors and nurses has contributed to severe health problems in Africa and parts of Asia.The report said at least four mi

发表于:2019-01-08 / 阅读(223) / 评论(0) 分类 2007年VOA标准英语(九月)

今天我们要学的词是career path。 Career path, 职业生涯。求职顾问建议大家尝试不同种类的工作。 Having a nonlinear career path can make you more interesting to potential employers, 有非直线职业生涯的人在雇人老

发表于:2019-02-02 / 阅读(150) / 评论(0) 分类 英语单词荟萃

The Eastern Star ship, which capsized in the Yangtze River Monday night, is located in a remote part of the river that is hard to access from land, making it difficult for personnel and rescue equipment to be delivered to the site. On Tuesday night,

发表于:2019-02-05 / 阅读(166) / 评论(0) 分类 cctv9英语新闻2015年

JOHANNESBURG, June 26 (Xinhua) -- Former South African President Nelson Mandela remained in a critical condition in hospital, President Jacob Zuma said on Wednesday. As he remains in a critical condition in hospital, we must keep him and the family i

发表于:2019-02-05 / 阅读(132) / 评论(0) 分类 英语新闻

Im 30 years old, and there are several things that life has taught me that I want to share with you. Some of these things Ive known since I was young, some of these things I have learned recently. 我现在30岁了,我想和大家分享一下这些年

发表于:2019-02-06 / 阅读(130) / 评论(0) 分类 阅读空间

1) Off the beaten path 很少有人去的 2) Overrun 泛滥,人太多 3) Local 当地人

发表于:2019-02-07 / 阅读(189) / 评论(0) 分类 OMG美语

In the Pacific state of Hawaii, U.S. President Barack Obama on Sunday told leaders of the 21 Asia Pacific Economic Cooperation economies that the region will be key to U.S. economic recovery. With much of the formal summit activity, including a worki

发表于:2019-02-08 / 阅读(164) / 评论(0) 分类 英语新闻

Im 30 years old, and there are several things that life has taught me that I want to share with you. Some of these things Ive known since I was young, some of these things I have learned recently. 我现在30岁了,我想和大家分享一下这些年

发表于:2019-02-13 / 阅读(121) / 评论(0) 分类 英语美文

By Scott Stearns Dakar 08 October 2009 Cameroon President Paul Biya (file photo) Authorities in Cameroon have closed a private FM radio station that has been broadcasting illegally from the capital for several months. The station was highly critical

发表于:2019-02-18 / 阅读(145) / 评论(0) 分类 VOA标准英语2009年(十月)

素材来源:《狗狗旅馆》 寄人篱下的姐弟俩为不能继续养自己的爱犬而烦恼,机缘巧合之下他们发现了一栋被废弃的旅馆,并结识了宠物店工作的戴夫和海瑟,他们四个一起联手,偷偷打造狗

发表于:2019-02-26 / 阅读(142) / 评论(0) 分类 英语口语
学英语单词
-legged
Add Words To
allantoic veins
allergic nodular angitis
anisaldehyde
anti-intellectualisms
antiaircraft fires
armature return spring
arna
basket weave
Bilychi
bootstrap capacitor
brush of kernel
buffer
byner
caelias
capillary bore
capital outlay
carbamide side cutter
cardy oil
chetas
clasmocytoma
claw couping
clivatine
colloquial name
computer managed instruction
data facility storage management subsystem
data validation
database reorganization
defeaters
detraditionalisation
dihydrocortisol
double password
Ehrlichia
envelope multiplex
Euro-parliament
ex-situ
excessive swelling
fascinators
first-order instrument
Foltz's valve
fuel oil distilled
gap in the market
garden shears
gsf
hang on back condenser
heated succession
heavily buffered flour
heribert
hirudinoid
in the north of
international coffee organization
intertanglement
jbm
kberg
level bottom community
Madeira cockroach
mHealth Alliance
Minuatia
mollydook
New Years
nifling
non-activating isotope
non-wetting
nonpublishers
notos
ordinary rate of profit
panel turnover machine
pathoplasticity
physics laboratories
pileggi
polyisomery
posttraumatic syndrome
primitivization
procurement costs
propagation mode
radiotelephone distress signal
Rana tarahumarae
rearview
repackable
restrict yourself to
ring technique
roof access
rotary Brownian motion
Rφdekro
saturation limiter
shaggymane
sheet-web weaver
Spanish bowline
spinning spool
stabilimentums
super velocity of light
tipsifying
twyman green interferometer
ultimate source
ultralarge crude carrier
velled
vertical oscillating transformer
Vilppula
viral arteritis
Väsman
Yegoryevsk