临界路径技术

1.Fuel your body with an amazing breakfast用美味的早餐给你身体充能 Have you ever noticed how some mornings you feel great and ready to tackle the world, and other days you have a mid-day slump? Having a healthy breakfast can help keep you

发表于:2018-12-12 / 阅读(148) / 评论(0) 分类 实用英语

Transcript This is Scientific American's 60-Second Science, I am Cynthia Graber.This will just take a minute. Physicists at the Brookhaven National Laboratory have been able to send information ahead of particle beams racing at nearly the speed of li

发表于:2018-12-24 / 阅读(226) / 评论(0) 分类 Scientific American(二)月

每期节目一话题,让英语磨练耳朵的同时学到更多有益的小知识,丰富知识的同时受益于生活。 Time-management tips 时间管理技巧 Work around procrastination. 克服拖延症。 Try Francesco Cirillo's Pomodoro Te

发表于:2018-12-27 / 阅读(164) / 评论(0) 分类 英语听力广播—Listening

People bring up the question:was Bruce Lee a real fighter? 人们提出了一个问题,李小龙是不是一个真正的格斗家 Bruce was a brilliant fighter.I saw him beat up a guy on a set of the Enter the Dragon. 布鲁斯是一个优秀的格斗

发表于:2018-12-27 / 阅读(162) / 评论(0) 分类 名人传记

If you are like many language students, you might have a problem with procrastination. Perhaps you are slow to do homework or study for a test. Maybe you do not like to study or you become distracted while studying. Whatever the case may be, learning

发表于:2019-01-02 / 阅读(518) / 评论(0) 分类 2017年VOA慢速英语(六)月

New Genetic Test Helps Find Food Poisoning American scientists are using genetic markers to investigate food poisoning cases linked to romaine lettuce. The Associated Press reports that their use of genetic sequencing is completely changing the disco

发表于:2019-01-03 / 阅读(154) / 评论(0) 分类 2018年VOA慢速英语(五)月

2. agri 你已认识field是“田地”, 你是否也知agri的意义? 在有关农田的词汇里, field竟都被agri所代替。 agri=field 田地,农田(agri也作agro,agr) 1. agrology agr

发表于:2019-01-06 / 阅读(191) / 评论(0) 分类 英文语法词汇

Feeling low and depressed? If you want to be able to instantly access a good mood, try this technique from life coach Rebekah Fensome. 感觉心情低落忧郁?如果你想迅速拥有好心情,试试生活教练Rebekah Fensome的小妙招吧。 If

发表于:2019-01-08 / 阅读(152) / 评论(0) 分类 实用英语

Vacationing on the island of Oahu, we were waiting in our tour bus for some stragglers to show up. A man, obviously not with our group, approached the bus and was about to board. How would our driver

发表于:2019-01-11 / 阅读(279) / 评论(0) 分类 英汉幽默故事选读

Science and Technology The Neolithic Boom-time machine 科技 新石器时代 时间机器解密:新石器时代的繁荣期 A new technique lets archaeologists reconstruct the past in greater detail 考古新技术让考古学家们能更加详尽地重

发表于:2019-01-26 / 阅读(214) / 评论(0) 分类 经济学人科技系列

At a recent Sacramento PC User's Group meeting, a company was demonstratingits latest speech-recognition software. A representative from the company was just about ready to start the demonstration and asked everyone in the room to quiet down. Just th

发表于:2019-01-30 / 阅读(214) / 评论(0) 分类 趣味英语

By Carol Pearson Washington 08 January 2008 New technology makes surgery safer, shortens recovery time and leaves no scars. Both physicians and patients are pleased with the results. VOA's Carol Pearson has more. Maria Viruet recently had her gallbla

发表于:2019-01-31 / 阅读(222) / 评论(0) 分类 VOA标准英语2008年(一月)

Vacationing on the island of Oahu, we were waiting in our tour bus for some stragglers to show up. A man, obviously not with our group, approached the bus and was about to board. How would our driver handle the situation, we wondered. Straight-faced,

发表于:2019-02-03 / 阅读(195) / 评论(0) 分类 趣味英语

What is it? Handstands, basically. 这是什么?可以说是双手倒立。 How much does it cost? Handstands are currently free to perform, although its always worth learning good technique. My trainer was aerialist Zoe Jones, who holds workshops

发表于:2019-02-07 / 阅读(223) / 评论(0) 分类 阅读空间

British MPs have voted in favour of the creation of babies with DNA from two women and one man, in an historic move. 英国国会议员投票通过一项具有历史性意义的决议,支持用两母一父的DNA培育婴儿。 The UK is now set to

发表于:2019-02-09 / 阅读(152) / 评论(0) 分类 阅读空间

The Federal Bureau of Investigation's secret method for unlocking the iPhone 5c used by one of the San Bernardino shooters will not work on newer models, FBI Director James Comey said. 美国联邦调查局局长詹姆斯科米近日表示,FBI用于破

发表于:2019-02-15 / 阅读(175) / 评论(0) 分类 英语新闻

Reproductive technology 生殖技术 Mum, Dad and Mitomum 妈妈,爸爸与代孕妈妈 Britain may allow babies with three biological parents 英有望允许新生儿有三个亲身父母 ASSISTED reproduction is one of those rare areas in which Br

发表于:2019-02-16 / 阅读(209) / 评论(0) 分类 经济学人科技系列

Science and technology 科学技术 The Neolithic 新石器时代 Boom-time machine 时间机器解密:新石器时代的繁荣期 Building site, 3670 BC 公元前3670年的建筑遗址 THAT economic expansion leads to building booms seems to have be

发表于:2019-02-16 / 阅读(210) / 评论(0) 分类 经济学人科技系列

托福阅读模拟题:托福阅读的关键是在于多看多练,在日常备考中,考生需要多做一些托福阅读模拟题。为了帮助广大考生更好的复习,新东方网为大家提供托福阅读模拟题:文艺复兴,希望

发表于:2019-02-18 / 阅读(155) / 评论(0) 分类 托福英语

知识点讲解: 1、中文意思一样 insist persist 2、两个词长得像 special specialty 3、长得像+中文意思一样 technique technology ① Technique 方法、技巧 Hes a great basketball player. He has flawless technique. 他是位很

发表于:2019-02-21 / 阅读(179) / 评论(0) 分类 每天三分钟学英语
学英语单词
angular harmonic motion
anion defect
Arzneimittelforschung
as plain as Salisbury
astern cam
at the touch of
bananageddon
becchi
blepharosphincterectomy
blogworthy
chatgroup
Coclé, Prov.de
cold cathode fluorescent tube
constant pressure cycle engine
critrcal inversion density
cross-stitching
cryomagnetic
data authentication code
descriptive crystallography
diamylbenzene
downside
duffin'
eddy cuttent crack detector
Eleocharis acicularis
ersta
European Common Market
First Reich
fixed mold
Garder, John W(illiam)
gas-oil ratio(gor)
genus Perisoreus
grand opera house
hash bucket
hemiarches
heterolysosone
holluschickies
Horqueta
ideology
impowring
in water-stressed conditions
individual exclusion
input disturbance
interrogation reply system
J-A
jumping hours indicator
keratitises
legal certainty
let drop a hint
loading-bays
lobed spleenwort
luminance potentiometer
magneto-optic(al) deflection
mechanism topology matrix
minor fog signal
mouth to mouth method
multibuffer
mutoni
oglio
Orlingbury
out-blossom
palm-sizest
periluminally
Pestvivirus
PIO (precision iterative operation)
plain saw
podzolized yellow earth
polyversities
position finding instrument
positive criticism
precipitation threshold
prismatick
privileged instruction operation
research engineer
revitalised
rigamaroles
Rosa rugosa
RUV
sampling pulse width
schionning
seeing the light
segment-long-spacing crystallites
selfe
shock isolation
sincere intention
smallpox viruss
springform pan
survivancy
test readiness certificate
the day is done
tickwood
toe-toe
trap stratigraphic
trouble-proof
uncambered bottom
Uncinatus
ungstenic
unquerying
uratolysis
ventilation map
West Azarbaijan
window shade
wolve