2015年CRI First High-speed Rail Tunnel from Chinese Inland to Hong Kong Cuts Through
时间:2019-02-14 作者:英语课 分类:2015CRI中国国际广播电台
The first high-speed rail tunnel linking the Chinese mainland 1 and Hong Kong has been cut through.
The 3,886-meter tunnel runs from Shenzhen City, south China's Guangdong Province to the Mai Po district of Hong Kong.
The Shenzhen section of the tunnel has been constructed to Chinese standards, with the section in Hong Kong built under European standards.
Wu Xiangong from the China Railway Group Company which is responsible for the construction of the tunnel's mainland section, said "We realized seamless joint 2 of Chinese standards and European standards in the two rail tunnel sections and we can use the experiences in future opportunities of tunnel constructions in Europe and even America. And through this practice we can find some ways that conform 3 to the 'going global' strategy 4."
The project is part of the underground high-speed rail linking Shenzhen to Kowloon.
Hong Kong will construct the Mai Po-Kowloon section.
The Shenzhen-Kowloon high-speed rail will be connected to the already operating Beijing-Shenzhen rail line.
The journey time from Beijing to Hong Kong will be cut from the current 20 hours to around nine hours.
- The new bridge will link the island to the mainland.新的桥梁将把该岛与大陆连接在一起。
- Hong Kong's prosperity relies heavily on mainland.香港的繁荣在很大程度上依赖于大陆。
- I had a bad fall,which put my shoulder out of joint.我重重地摔了一跤,肩膀脫臼了。
- We wrote a letter in joint names.我们联名写了封信。
- The building does not conform to safety regulations.这座建筑物不符合安全条例。
- Her ideas do not conform with mine.她的观点与我的不一致。