CNN 2012-08-11
时间:2019-01-08 作者:英语课 分类:CNN2012年(八)月
英语课
The focus of the Olympic security has understandably been terrorism, but the organizers have numerous contingency 1 plans for other risks. An obvious concern is London's transport network. A power blackout or fire could cause massive disruption to the Games. This control room in south London is where buses, trains, cars and London's chief networks are monitored, with the police and fire brigade also in the same room, all prepared for every eventuality.
Whether there will be a power cut or there will be a signal failure, but ahead of the Games, we've done lots to ensure that we've done the best maintenance, so that the likely of those incidents we reduce as much as possible. If they do happen, we've got spare parts and forward maintenance team in strategic locations around the network to get things resolved really quickly.
The Great British weather has already tested the athletes and spectators, but it's also tested those planning for the worst. Floods could force the cancellation 2 of some events.
Obviously, there would be disruption, should something like that happen. And I'm sure that you can't, you can't prevent the rains from falling, but you can manage the consequence of it.
The food supply to athletes and spectators is one area of concern. How can you prevent food poisoning from poor hygiene 3? Melanie Patterson shows there is a new rapid DNA 4 test to isolate 5 food box, vital in the event of food poisoning outbreak in the Olympic village.
It's a test that locates the DNA from the bug 6 that might cause illness, say
some (narrowness stare?), for example. Ah....most people in the past for tested culture, but this is the most sensitive and much quicker. So, ah... culture test may take four days to give you negative result, but this give you the same result in just one day.
For more period, you get a real sense of how fast London is and how complex contingency plan is on an ordinary day. That low when you add in a quarter of a million extra visitors for the OlympicsYou get a real sense of how difficult it is to gain play every scenario 7. But that's exactly what's happening.
The Government's Cobb Emergency Committee have been meeting to talk through the risks and contingency plans which everyone hopes will be never be needed.
Dan Rivers, CNN, London.
Whether there will be a power cut or there will be a signal failure, but ahead of the Games, we've done lots to ensure that we've done the best maintenance, so that the likely of those incidents we reduce as much as possible. If they do happen, we've got spare parts and forward maintenance team in strategic locations around the network to get things resolved really quickly.
The Great British weather has already tested the athletes and spectators, but it's also tested those planning for the worst. Floods could force the cancellation 2 of some events.
Obviously, there would be disruption, should something like that happen. And I'm sure that you can't, you can't prevent the rains from falling, but you can manage the consequence of it.
The food supply to athletes and spectators is one area of concern. How can you prevent food poisoning from poor hygiene 3? Melanie Patterson shows there is a new rapid DNA 4 test to isolate 5 food box, vital in the event of food poisoning outbreak in the Olympic village.
It's a test that locates the DNA from the bug 6 that might cause illness, say
some (narrowness stare?), for example. Ah....most people in the past for tested culture, but this is the most sensitive and much quicker. So, ah... culture test may take four days to give you negative result, but this give you the same result in just one day.
For more period, you get a real sense of how fast London is and how complex contingency plan is on an ordinary day. That low when you add in a quarter of a million extra visitors for the OlympicsYou get a real sense of how difficult it is to gain play every scenario 7. But that's exactly what's happening.
The Government's Cobb Emergency Committee have been meeting to talk through the risks and contingency plans which everyone hopes will be never be needed.
Dan Rivers, CNN, London.
n.意外事件,可能性
- We should be prepared for any contingency.我们应该对任何应急情况有所准备。
- A fire in our warehouse was a contingency that we had not expected.库房的一场大火是我们始料未及的。
n.删除,取消
- Heavy seas can cause cancellation of ferry services.海上风浪太大,可能须要取消渡轮服务。
- Her cancellation of her trip to Paris upset our plan.她取消了巴黎之行打乱了我们的计划。
n.健康法,卫生学 (a.hygienic)
- Their course of study includes elementary hygiene and medical theory.他们的课程包括基础卫生学和医疗知识。
- He's going to give us a lecture on public hygiene.他要给我们作关于公共卫生方面的报告。
(缩)deoxyribonucleic acid 脱氧核糖核酸
- DNA is stored in the nucleus of a cell.脱氧核糖核酸储存于细胞的细胞核里。
- Gene mutations are alterations in the DNA code.基因突变是指DNA密码的改变。
vt.使孤立,隔离
- Do not isolate yourself from others.不要把自己孤立起来。
- We should never isolate ourselves from the masses.我们永远不能脱离群众。
n.虫子;故障;窃听器;vt.纠缠;装窃听器
- There is a bug in the system.系统出了故障。
- The bird caught a bug on the fly.那鸟在飞行中捉住了一只昆虫。