商务英语必备1000字 Unit30
时间:2018-12-31 作者:英语课 分类:商务英语必备1000字
QC procedure
品管流程
What issues do we need to address to work out new QC procedures?
在制定新品管流程之前,有哪些問題必須先處理?
quality standard
品質標準
This year, Metro 1 Factory experienced a noticeable decline in quality standards.
今年,都會工廠在品質標準上明顯下降。
random 2 sampling
隨機抽樣
We did the random sampling of five pieces per batch 3 of 100.
我們在每批一百件的貨品中取五件隨機抽樣。
recall
v. 回收
The car company recalled 3,000 SUVs because of a brake problem.
這家汽車公司由於剎車問題回收了三千輛運動休旅車。
reject
v. 拒收;退回
If inspectors 4 find more than three defective 5 items, the batch is rejected.
如果檢驗員發現超過三件不良品就整批退回。
simulation test
模擬測試
I think we'll need to design some new simulation tests.
我認為我們必須設計一些新的模擬測試。
- Can you reach the park by metro?你可以乘地铁到达那个公园吗?
- The metro flood gate system is a disaster prevention equipment.地铁防淹门系统是一种防灾设备。
- The list is arranged in a random order.名单排列不分先后。
- On random inspection the meat was found to be bad.经抽查,发现肉变质了。
- The first batch of cakes was burnt.第一炉蛋糕烤焦了。
- I have a batch of letters to answer.我有一批信要回复。
- They got into the school in the guise of inspectors. 他们假装成视察员进了学校。 来自《简明英汉词典》
- Inspectors checked that there was adequate ventilation. 检查员已检查过,通风良好。 来自《简明英汉词典》